GasLink ™ Fuel Gas Supply System
The SunRui GasLink™ FGSS ensures stable, efficient, and secure LNG/Ammonia/Methanol fuel supply, catering to the demanding needs of modern marine propulsion and auxiliary systems.
Comprehensive Fuel Solutions for Marine Engines
SunRui GasLink™ Fuel Gas Supply System (FGSS) offers a fully integrated solution for both high-pressure and low-pressure engines, meeting the diverse gas supply needs of various engine types. This system supports two-stroke low-pressure main engines (WinGD), two-stroke high-pressure main engines (MAN-GI), four-stroke engines (Wärtsilä, MAN-DF, MAK, Rolls-Royce, NIGATA), and additional marine equipment like boilers. Utilizing cryogenic tanks for LNG storage, the FGSS ensures reliable fuel supply through advanced pressure boosting and vaporization technologies.
Key Features:
- Versatile Compatibility: Supports a wide range of engine types and marine equipment.
- Advanced Storage: Utilizes cryogenic tanks for effective LNG storage.
- Efficient Supply: Employs submerged pumps and water/ethylene glycol vaporization for fuel delivery.
- Integrated Control: Features a highly automated control system with multi-point data acquisition.
- Safety and Stability: Ensures operational security with independent control and security systems, and verified gas supply stability through hierarchical control technology and buffer tank simulation.
Low Pressure Supply System
- Gas Supply Pressure: 1014 barG (main engine), 68 barG (generator).
- Gas Supply Temperature: 0~60 ℃.
- System Components: Includes LNG bunkering station, LNG tank & TCS, LNG vaporization heating unit, BOG compressor unit, water/glycol circulation unit, control system, and ESD system.
- Optional Equipment: Features ship-shore connection system, ventilation system, gas detection system, N2 supply generator, double-wall pipe, etc.
- Supporting Models: Suitable for low-pressure two-stroke main engines, low-pressure four-stroke main engines, generators, gas boilers, and more.
High Pressure Supply System
- Gas Supply Pressure: 200~300 barG (main engine), 69 barG (generator).
- Gas Supply Temperature: 45±10 ℃.
- System Components: Includes LNG bunkering station, LNG tank & TCS, LNG vaporization heating unit, BOG compressor unit, water/glycol circulation unit, control system, and ESD system.
- Optional Equipment: Features ship-shore connection system, ventilation system, gas detection system, N2 supply generator, double-wall pipe, etc.
- Supporting Models: Suitable for high-pressure two-stroke main engines, high-pressure four-stroke main engines, generators, gas boilers, and more.
Contact us today
Get in touch with Eiken Maritime for expert guidance and top-tier marine solutions. Contact us today to discuss your specific needs and discover how we can enhance your operations, our experienced team is here to help.